Product image is representative only, please verify specifications.
I51AP215F00001K03S
Alt: 16559516
$472.97
VFD, 1.5kW, 2.0hp, 400/480VAC, 3/PE, No Safety Technology, No Extension Box, LCD Keypad Module with Standard I/O with Modbus RTU, NEMA 1, IP20, i510 Series
- Weight:
- 3.30 LBS
- Minimum Purchase:
- 1 unit
Description
Lenze Americas is a U.S. based global company that designs and manufacturers inverters, gear motors and mechanical components.
Lenze Americas was formerly known as AC Tech and continues to manufacturer these popular drives. Lenze Americas is headquartered in Massachusetts while Lenze SE corporate headquarters are located in Hamelin, Germany.
Series Features Include:
- Overload current: Mode S1: 150 %, mode S6: 200 %
- Interfaces: Digital inputs/outputs (5/1), analog inputs/outputs (2/1), Relay, External 24 V supply, CANopen, Modbus RTU
- Approvals: CE, UL, CSA, EAC, RoHS2, IE2 in accordance with EN 50598-2
- Functions: V/f characteristic control linear/quadratic (VFC plus), Sensorless vector control (SLVC), Energy saving function (VFC-Eco), Sensorless vector control for synchronous motors, DC braking, Brake management for low-wear brake control, S-ramps for smooth acceleration and delay, Flying restart circuit, PID controller
- Ingress protection up to IP31 (NEMA 1) with protection against contact, condensation and vertically falling drops of water. This allows for use inside or outside the control cabinet.
- Sensorless synchronous motor control
- Intuitive user interface for fast setup and an easy navigation parameter structure
- EPM module for simple series commissioning and device replacement
- Optionally equipped with keypad or WLAN diagnostic module
Technical Information:
- Lenze i510 Protec Frequency Inverter Flyer
- Lenze i510 Protec Frequency Inverter Operating Instructions
- Lenze i510 Protec Frequency Inverter Commissioning Guide
- Lenze i510 Protec Mounting and Switch-On Instructions
- Lenze i500 Reference Card Inverter Operating Instructions
- Lenze i510 Protec Frequency Inverter Project Planning Guide
- Lenze MC NEMA 1 to i510/i550 Protec NEMA 1 Substitution Guide